Transformer Failure

The problem:

Late afternoon and Vector's transformer has sprung an oil leak and is required to be shut down immediately. The customer:

A major construction company operating two tower cranes at Auckland airport.

The solution:

GRNZ express delivers a 500kVA generator to site with two super long 185mm cable sets and assists with connection. Daily refuelling and checks are undertaken until the transformer can be repaired and proven. The result:

Site is up and running on generator overnight, both tower cranes are operational and construction continues.

Get in Touch Today

Call us or email us to discuss your specific requirements with our engineering team.

Get a quote

Contact us

Have a question or need a quote? Please use the form below to get in touch with us. We aim to respond as quickly as possible.

Thank you for reaching out! Your message has been successfully sent. Our team will be in touch shortly to discuss your generator hire needs.
Something went wrong! Please check your details and try again, or give us a call if the problem persists.