Transformer Failure
The problem:
Late afternoon and Vector's transformer has sprung an oil leak and is required to be shut down immediately. The customer:
A major construction company operating two tower cranes at Auckland airport.
The solution:
GRNZ express delivers a 500kVA generator to site with two super long 185mm cable sets and assists with connection. Daily refuelling and checks are undertaken until the transformer can be repaired and proven. The result:
Site is up and running on generator overnight, both tower cranes are operational and construction continues.
Get in Touch Today
Call us or email us to discuss your specific requirements with our engineering team.